Andhra Pradesh Wind Energy Tariff Regulations - 2015 | Wind Power |
Andhra Pradesh |
2015 |
| 2 |
Andhra Pradesh Renewable Power Purchase Obligation (Compliance By Purchase Of Renewable Energy/Renewable Energy Certificates) Regulation - 2017 | Bagasse Cogen,Biogas,Biomass,Waste to Energy,Solar Energy,Wind Power |
Andhra Pradesh |
2016 |
| 3 |
Assam Renewable Energy Tariff Regulations - 2012 | Bagasse Cogen,Biogas,Biomass,Small Hydro,Solar Energy,Wind Power |
Assam |
2012 |
| 4 |
Assam Grid Interactive Solar PV System Regulations - 2015 | Solar Energy |
Assam |
2015 |
| 5 |
Assam Renewable Power Purchase Obligation And Its Compliance Regulations - 2010 | |
Assam |
2010 |
| 6 |
Arunachal Pradesh Renewable Power Purchase Obligation And Its Compliance Regulations - 2012 | |
Arunachal Pradesh |
2012 |
| 7 |
Arunachal Pradesh Draft Net Metering Regulations - 2016 | Solar Energy |
Arunachal Pradesh |
2016 |
| 8 |
Arunachal Pradesh Renewable Energy Tariff Regulations - 2012 | Solar Energy,Small Hydro,Biomass |
Arunachal Pradesh |
2012 |
| 9 |
Bihar Solar Energy Tariff Regulations - 2010 | Solar Energy |
Bihar |
2010 |
| 10 |
Bihar Tariff Order* For Biomass, Bagasse Cogeneration, Biomass Gasifier And MSW Based Power Plants - 2016 | Bagasse Cogen,Biomass,Waste to Energy |
Bihar |
2016 |
| 11 |
Bihar Renewable Power Purchase Obligation And Its Compliance Regulations -2010 | |
Bihar |
2010 |
| 12 |
Grid Interactive Solar PV Systems Regulations, Bihar - 2015 | Solar Energy |
Bihar |
2015 |
| 13 |
Chhattisgarh MSW Tariff Regulations - 2016 | Waste to Energy |
Chhattisgarh |
2016 |
| 14 |
Draft Chhattisgarh Renewable Energy Tariff Regulations - 2017 | Waste to Energy,Biomass,Bagasse Cogen,Wind Power,Solar Energy,Small Hydro |
Chhattisgarh |
2017 |
| 15 |
Chhattisgarh Renewable Power Purchase Obligation And Its Compliance Regulations - 2016 | |
Chhattisgarh |
2016 |
| 16 |
Delhi Net Metering Regulations - 2014 | |
Delhi |
2014 |
| 17 |
Delhi Grid-connected Solar PV Tariff Regulations - 2013 | Solar Energy |
Delhi |
2013 |
| 18 |
Draft Delhi Renewable Power Purchase Obligations And Its Compliance Regulations, 2017 | |
Delhi |
2017 |
| 19 |
Gujarat Net Metering Regulations - 2016 | |
Gujarat |
2016 |
| 20 |
Gujarat Renewable Power Purchase Obligations And Its Compliance Regulations - 2010 | |
Gujarat |
2010 |
| 21 |
CERC (Terms And Conditions For Tariff Determination From Renewable Energy Sources) Regulations | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Biomass,Biogas,Bagasse Cogen |
All India |
2012 |
| 22 |
CERC Generic Tariff For RE Technologies For FY 2016-17 | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Biomass,Biogas,Bagasse Cogen |
All India |
2016 |
| 23 |
Jammu And Kashmir State Electricity Regulatory Commission Intra-State Open Access Regulations (Consolidated) -2015 | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Micro-grid,Biomass,Biogas,Bagasse Cogen |
Jammu and Kashmir |
2015 |
| 24 |
Andhra Pradesh Electricity Regulatory Commission Intra State Open Access Regulations (Consolidated) | Bagasse Cogen,Biogas,Biomass,Micro-grid,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Andhra Pradesh |
2016 |
| 25 |
Haryana Renewable Energy Tariff Regulations - 2010 | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Biomass,Biogas,Bagasse Cogen |
Haryana |
2010 |
| 26 |
Haryana Net Metering Regulations - 2014 | |
Haryana |
2014 |
| 27 |
Tamil Nadu Intra State Open Access Regulations (Consolidated) | Bagasse Cogen,Biogas,Biomass,Micro-grid,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Tamil Nadu |
2017 |
| 28 |
Maharashtra Distribution Open Access Regulations (Consolidated) -2009 | Bagasse Cogen,Biogas,Biomass,Micro-grid,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Maharashtra |
2016 |
| 29 |
The Maharashtra Electricity Regulatory Commission (Transmission Open Access) Regulations, 2016 | |
Maharashtra |
2016 |
| 30 |
Orissa Electricity Regulatory Commission Open Access Regulations (Consolidated) | |
Orissa |
2017 |
| 31 |
GUJARAT ELECTRICITY REGULATORY COMMISSION Open Access Regulations (Consolidated) - 2011 | |
Gujarat |
2011 |
| 32 |
Assam Electricity Regulatory Commission (Terms And Conditions For Open Access) Regulations, 2005 | |
Assam |
2005 |
| 33 |
Arunachal Pradesh State Electricity Regulatory Commission (Terms And Conditions Of Intra-State Open Access) Regulations | Bagasse Cogen,Biogas,Biomass,Micro-grid,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Arunachal Pradesh |
2012 |
| 34 |
Himachal Pradesh Renewable Energy Tariff Regulations - 2012 | Solar Energy,Small Hydro,Waste to Energy |
Himachal Pradesh |
2012 |
| 35 |
Himachal Pradesh Renewable Power Purchase Obligations And Its Compliance Regulations - 2010 | |
Himachal Pradesh |
2010 |
| 36 |
Himachal Pradesh Net Metering Regulations, 2015 | |
Himachal Pradesh |
2015 |
| 37 |
Jammu And Kashmir Renewable Energy Tariff Regulations - 2013 | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Biomass,Biogas,Bagasse Cogen |
Jammu and Kashmir |
2013 |
| 38 |
Jammu And Kashmir Renewable Power Purchase Obligations And Its Compliance Regulations, 2011 | Bagasse Cogen,Biogas,Biomass,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Jammu and Kashmir |
2012 |
| 39 |
Jammu And Kashmir Net Metering Regulations - 2014 | |
Jammu and Kashmir |
2014 |
| 40 |
JERC Grid Connected Solar Power Regulations - 2015 | Solar Energy |
Andaman and Nicobar Islands, Chandigarh, Dadra and Nagar Haveli, Daman and Diu, Goa, Lakshadweep, Po |
2015 |
| 41 |
JERC Procurement Of Renewable Energy Regulations - 2010 | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Biomass,Biogas,Bagasse Cogen |
Andaman and Nicobar Islands, Chandigarh, Dadra and Nagar Haveli, Daman and Diu, Goa, Lakshadweep, Pondicherry |
2010 |
| 42 |
Jharkhand Renewable Energy Tariff Regulations - 2016 | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Biomass,Biogas,Bagasse Cogen |
Jharkhand |
2016 |
| 43 |
Jharkhand Renewable Power Purchase Obligation And Its Compliance Regulations - 2016 | |
Jharkhand |
2016 |
| 44 |
Jharkhand Net Metering Regulations - 2015 | |
Jharkhand |
2015 |
| 45 |
Odisha Net Metering Order - 2016 | |
Orissa |
2016 |
| 46 |
Odisha Renewable Power Purchase Obligation And Its Compliance Regulations, 2015 | |
Orissa |
2015 |
| 47 |
Madhya Pradesh Electricity Regulatory Commission Intra-State Open Access Regulations (Consolidated) | |
Madhya Pradesh |
2005 |
| 48 |
Telangana Open Access Regulations (Consolidated) | Bagasse Cogen,Biogas,Biomass,Micro-grid,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Telangana |
2014 |
| 49 |
Karnataka Electricity Regulatory Commission (Terms And Conditions For Open Access) Regulations, 2004 | Bagasse Cogen,Biogas,Biomass,Micro-grid,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Karnataka |
2004 |
| 50 |
Kerala State Electricity Regulatory Commission Open Access Regulations (Consolidated), 2013 | |
Kerala |
2013 |
| 51 |
Bihar Open Access Regulations (Consolidated) - 2005 | |
Bihar |
2005 |
| 52 |
Chhattisgarh Open Access Regulations (Consolidated) - 2011 | Bagasse Cogen,Biogas,Biomass,Micro-grid,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Chhattisgarh |
2011 |
| 53 |
Rajasthan Open Access Regulations , 2016 | |
Rajasthan |
2016 |
| 54 |
Jharkhand Open Access Regulations (Consolidated) - 2016 | |
Jharkhand |
2016 |
| 55 |
Haryana Open Access Regulations (Consolidated) - 2012 | |
Haryana |
2012 |
| 56 |
Punjab Renewable Energy Tariff Orders - 2016 | Bagasse Cogen,Biomass,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Punjab |
2016 |
| 57 |
Punjab Net Metering Regulations - 2015 | |
Punjab |
2015 |
| 58 |
Punjab Renewable Power Purchase Obligation And Its Compliance Regulations | Bagasse Cogen,Biogas,Biomass,Micro-grid,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Punjab |
2015 |
| 59 |
Rajasthan Renewable Energy Tariff Orders, 2016 | Biomass,Solar Energy,Wind Power,Biomass |
Rajasthan |
2016 |
| 60 |
Rajasthan Net Metering Regulations - 2015 | |
Rajasthan |
2015 |
| 61 |
Rajasthan Renewable Power Purchase Obligation And Its Compliance Regulations - 2010 | |
Rajasthan |
2010 |
| 62 |
Tamil Nadu Renewable Energy Orders - 2016 | Wind Power,Solar Energy,Biomass,Bagasse Cogen |
Tamil Nadu |
2016 |
| 63 |
Tamil Nadu Renewable Power Purchase Obligation And Its Compliance Regulations | Bagasse Cogen,Biogas,Biomass,Micro-grid,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Tamil Nadu |
2010 |
| 64 |
Telangana MSW/RDF Tariff Order - 2016 | Waste to Energy |
Telangana |
2016 |
| 65 |
Telangana Net Metering Regulations - 2016 | Solar Energy |
Telangana |
2016 |
| 66 |
Tripura Net Metering Regulations - 2016 | Solar Energy |
Tripura |
2016 |
| 67 |
Tripura Renewable Energy Tariff Regulations - 2015 | Wind Power,Solar Energy,Small Hydro,Biomass,Biogas,Bagasse Cogen |
Tripura |
2015 |
| 68 |
Tripura Renewable Power Purchase Obligation And Its Compliance Regulations - 2015 | |
Tripura |
2015 |
| 69 |
Uttar Pradesh Net Metering Regulations - 2015 | Solar Energy |
Uttar Pradesh |
2015 |
| 70 |
Uttar Pradesh Renewable Power Purchase Obligation And Its Compliance Regulations | |
Uttar Pradesh |
2016 |
| 71 |
Uttarakhand Renewable Energy Tariff Regulations - 2013 | Bagasse Cogen,Biogas,Biomass,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Uttarakhand |
2013 |
| 72 |
Uttarakhand Renewable Power Purchase Obligation And Its Compliance Regulations - 2010 | |
Uttarakhand |
2010 |
| 73 |
Joint Electricity Regulatory Commission For Manipur And Mizoram (Terms And Conditions For Open Access) Regulations, 2010 | |
Manipur |
2010 |
| 74 |
Punjab Open Access Regulations - 2011 | Bagasse Cogen,Biogas,Biomass,Micro-grid,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Punjab |
2011 |
| 75 |
Tripura Open Access Regulations (Consolidated) | |
Tripura |
2010 |
| 76 |
Nagaland Open Access Regulations (Consolidated) , 2012 | |
Nagaland |
2012 |
| 77 |
Gujarat Renewable Energy Tariff Orders* | Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Gujarat |
2015 |
| 78 |
West Bengal Open Access Regulations (Consolidated) - 2007 | |
West Bengal |
2007 |
| 79 |
Delhi Open Access Regulations (Consolidated) - 2005 | |
Delhi |
2005 |
| 80 |
Meghalaya Open Access Regulations - 2012 | |
Meghalaya |
2012 |
| 81 |
Uttarakhand Open Access Regulations (Consolidated) , 2015 | |
Uttarakhand |
2015 |
| 82 |
Himachal Pradesh Open Access Regulations (Consolidated) - 2010 | |
Himachal Pradesh |
2010 |
| 83 |
Sikkim Open Access Regulations , 2012 | |
Sikkim |
2012 |
| 84 |
Framework On Forecasting, Scheduling And Imbalance Handling For Variable Renewable Energy Sources (Wind And Solar) | Wind Power,Solar Energy |
All India |
2015 |
| 85 |
Terms And Conditions For Recognition And Issuance Of Renewable Energy Certificate For Renewable Energy Generation | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Biomass,Biogas,Bagasse Cogen |
All India |
2010 |
| 86 |
Meghalaya (Renewable Energy Purchase Obligation & Its Compliance) Regulations - 2015 | |
Meghalaya |
2015 |
| 87 |
Meghalaya State Electricity Regulatory Commission (Rooftop Solar Grid-Interactive Systems Based On Net Metering) Regulations, 2015 | |
Meghalaya |
2015 |
| 88 |
Meghalaya State Electricity Regulatory Commission (Terms And Conditions For Determination Of Tariff For Generation From Renewable Energy Sources) Regulations, 2014 | |
Meghalaya |
2014 |
| 89 |
Karnataka Renewable Energy Tariff Orders* | Wind Power,Solar Energy,Small Hydro,Biomass,Bagasse Cogen |
Karnataka |
2016 |
| 90 |
Karnataka Renewable Power Purchase Obligation And Its Compliance Regulations, 2015 | Bagasse Cogen,Biogas,Biomass,Micro-grid,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Karnataka |
2015 |
| 91 |
Kerala Renewable Energy Tariff Regulations - 2015 | Wind Power,Solar Energy,Small Hydro |
Kerala |
2015 |
| 92 |
Kerala Renewable Power Purchase Obligation And Its Compliance Regulations - 2015 | |
Kerala |
2015 |
| 93 |
Kerala Net Metering Regulations - 2014 | Solar Energy |
Kerala |
2014 |
| 94 |
Madhya Pradesh Renewable Energy Tariff Orders - 2017 | Bagasse Cogen,Biogas,Biomass,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Madhya Pradesh |
2017 |
| 95 |
Madhya Pradesh Renewable Power Purchase Obligation And Its Compliance Regulations - 2010 | |
Madhya Pradesh |
2010 |
| 96 |
Madhya Pradesh Net Metering Regulations - 2015 | |
Madhya Pradesh |
2015 |
| 97 |
Maharashtra Renewable Energy Tariff Orders - 2017 | Wind Power,Solar Energy,Small Hydro,Biomass,Bagasse Cogen |
Maharashtra |
2017 |
| 98 |
Maharashtra Renewable Power Purchase Obligations And Its Compliance Regulations - 2016 | |
Maharashtra |
2016 |
| 99 |
Maharashtra Net Metering Regulations - 2015 | Solar Energy |
Maharashtra |
2015 |
| 100 |
Sikkim Renewable Energy Tariff Regulations | Wind Power,Solar Energy,Small Hydro,Biomass,Bagasse Cogen |
Sikkim |
2012 |
| 101 |
Sikkim Renewable Power Purchase Obligation And Its Compliance Regulations | |
Sikkim |
2013 |
| 102 |
Sikkim Net Metering Regulations | Solar Energy |
Sikkim |
2014 |
| 103 |
Joint Electricity Regulatory Commission For The States Of Manipur & Mizoram (Renewable Purchase Obligation And Its Compliance) Regulations, 2010 | |
Manipur |
2010 |
| 104 |
Joint Electricity Regulatory Commission For Manipur And Mizoram (Metering For Grid Connected Renewable Energy) Regulations, 2016 | |
Manipur |
2016 |
| 105 |
Joint Electricity Regulatory Commission For Manipur And Mizoram (Terms And Conditions For Tariff Determination from Renewable Energy Sources) Regulations, 2010 | |
Manipur |
2010 |
| 106 |
Nagaland Electricity Regulatory Commission (Terms And Conditions For Determination Of Generation Tariff For Renewable Energy) Regulations, 2011 | Bagasse Cogen,Biogas,Biomass,Micro-grid,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
Nagaland |
2011 |
| 107 |
Nagaland Electricity Regulatory Commission Renewable Power Purchase Obligation And Its Compliance Regulations, 2011 | Solar Energy |
Nagaland |
2011 |
| 108 |
Uttar Pradesh Mini-grid Regulations - 2016 | Micro-grid |
Uttar Pradesh |
2016 |
| 109 |
Bihar Draft Mini-Grid Regulations - 2016 | Micro-grid |
Bihar |
2016 |
| 110 |
Tripura Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement And Related Matters Of Solar And Wind Generation Sources) Regulations, 2016 | |
Tripura |
2016 |
| 111 |
Draft Andhra Pradesh (Forecasting, Scheduling, Deviation Settlement And Other) Regulations, 2016 | |
Andhra Pradesh |
2016 |
| 112 |
Draft Gujarat Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement And Related Matters Of Solar And Wind Generation Sources) Regulations, 2017 | |
Gujarat |
2017 |
| 113 |
West Bengal Renewable Energy Regulations - 2013 | Biogas,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
West Bengal |
2013 |
| 114 |
Jammu And Kashmir Mini Grid Renewable Energy Generation And Supply Regulations, 2016 | Micro-grid |
Jammu and Kashmir |
2016 |
| 115 |
Madhya Pradesh Micro Grid Renewable Energy Generation And Supply Regulations, 2016 | Micro-grid |
Madhya Pradesh |
2016 |
| 116 |
Joint Electricity Regulatory Commission Goa And Union Territories (Open Access In Transmission And Distribution) Regulations, 2009 | |
Goa |
2009 |
| 117 |
Central Electricity Regulatory Commission (Terms And Conditions For Tariff Determination From Renewable Energy Sources) Regulations - 2017 | Bagasse Cogen,Biogas,Biomass,Waste to Energy,Small Hydro,Solar Energy,Wind Power |
All India |
2017 |
| 118 |
CERC Normative Parameters And Generic Tariff For RE Technologies For FY 2017-18 | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Biomass,Biogas,Bagasse Cogen |
All India |
2017 |
| 119 |
Assam (Micro/Mini-grid Renewable Energy Generation And Supply) Regulations - 2017 | Micro-grid |
Assam |
2017 |
| 120 |
Andhra Pradesh Forecasting, Scheduling And Deviation Settlement Of Solar Wind Generation Regulations, 2017 | |
Andhra Pradesh |
2017 |
| 121 |
Arunachal Pradesh Draft Terms And Conditions For Tariff Determination From Renewable Energy Sources Regulation - 2018 | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Micro-grid,Biomass,Biogas,Bagasse Cogen |
Arunachal Pradesh |
2018 |
| 122 |
Central Electricity Regulatory Commission (Grant Of Connectivity And General Network Access To The Inter-state Transmission System And Other Related Matters) Regulations - 2017 | |
All India |
2017 |
| 123 |
Draft Assam Electricity Regulatory Commission (Terms And Conditions For Open Access) Regulations, 2018 | |
Assam |
2018 |
| 124 |
Renewable Energy Tariff Orders, 2018 | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Micro-grid,Biomass,Biogas,Bagasse Cogen |
Tamil Nadu |
2018 |
| 125 |
APERC Renewable Power Purchase Obligation (Compliance By Purchase Of Renewable Energy/Renewable Energy Certificates) Regulations, 2017 | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Micro-grid,Biomass,Biogas,Bagasse Cogen |
Andhra Pradesh |
2017 |
| 126 |
APERC (Power Evacuation From Captive Generation, Co-generation And Renewable Energy Source Power Plants) Regulations, 2017 | |
Andhra Pradesh |
2017 |
| 127 |
BERC (Terms And Conditions For Tariff Determination From Renewable Energy Sources) Regulations, 2017 | |
Bihar |
2017 |
| 128 |
CSERC (Terms And Conditions For Determination Of Generation Tariff And Related Matters For Electricity Generated By Plants Based On Renewable Energy Sources) Regulations, 2017 | |
Chhattisgarh |
2017 |
| 129 |
Himachal Pradesh (Promotion Of Generation From Renewable Energy Sources, And Terms And Conditions For Tariff Determination) Regulations, 2017 | |
Himachal Pradesh |
2017 |
| 130 |
Order On Net Metering/Bi-directional Metering And Their Connectivity With Respect To Solar PV Projects, 2016 Amended Up To 17.01.2018 | |
Orissa |
2018 |
| 131 |
Karnataka Renewable Energy Tariff Orders, 2018 | |
Karnataka |
2018 |
| 132 |
Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement And Related Matters Of Solar And Wind Generation Sources) Regulations, 2017 | |
Uttar Pradesh |
2017 |
| 133 |
BERC (Rooftop Solar Grid Interactive Systems Based On Net And Gross Metering) Regulations, 2018 | |
Bihar |
2018 |
| 134 |
Consultative Paper On BERC (Terms And Conditions Of Intra-State Open Access) Regulations, 2017 | |
Bihar |
2017 |
| 135 |
BERC (Banking Of Power From Fossil Fuel And Renewable Energy Based Captive Generating Plant) Regulations, 2018 | |
Bihar |
2018 |
| 136 |
Arunachal Pradesh Terms And Conditions For Tariff Determination From Renewable Energy Sources Regulation – 2018 (Consolidated) | Small Hydro, Wind Power, Solar Energy |
Arunachal Pradesh |
2018 |
| 137 |
BERC (Terms And Conditions For Tariff Determination From Renewable Energy Sources) Regulations, 2017, Including First Amendment 2018 | Wind Power, Solar Energy, Small Hydro, Waste to Energy, Micro-grid, Biomass, Biogas, Bagasse Cogen |
Bihar |
2017 |
| 138 |
Assam Electricity Regulatory Commission Draft (Forecasting, Scheduling, Deviation Settlement And Related Matters For Solar And Wind Generation Sources) Regulations, 2018 | Wind Power, Solar Energy, Small Hydro, Waste to Energy, Micro-grid, Biomass, Biogas, Bagasse Cogen |
Assam |
2018 |
| 139 |
Himachal Pradesh (Promotion Of Generation From Renewable Energy Sources, And Terms And Conditions For Tariff Determination) Regulations, 2017* | Bagasse Cogen, Biogas, Biomass, Micro-grid, Waste to Energy, Small Hydro, Solar Energy, Wind Power |
Himachal Pradesh |
2017 |
| 140 |
Himachal Pradesh Net Metering Regulations, 2015, Including Amendment 2018 | Bagasse Cogen, Biogas, Biomass, Micro-grid, Waste to Energy, Small Hydro, Solar Energy, Wind Power |
Himachal Pradesh |
2018 |
| 141 |
Meghalaya State Electricity Regulatory Commission (Forecasting, Scheduling And Deviation Settlement For Solar And Wind Generation) Regulations, 2018 | |
Meghalaya |
2018 |
| 142 |
Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement And Related Matters Of Solar And Wind Generation Sources) Regulations, 2017 | Solar Energy, Wind Power |
Rajasthan |
2017 |
| 143 |
Sikkim State Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement And Related Matters Of Solar And Wind Generation Sources) Regulations, 2018 | Solar Energy, Wind Power |
Sikkim |
2018 |
| 144 |
Bihar Electricity Regulatory Commission (Terms And Conditions Of Intra-State Open Access) Regulations 2018 | Bagasse Cogen, Biogas, Biomass, Micro-grid, Waste to Energy, Small Hydro, Solar Energy,Wind Power |
Bihar |
2018 |
| 145 |
Power Procurement From New And Renewable Sources Of Energy And Its Compliance Regulations, 2010 Including Amendment 2018 | Bagasse Cogen, Biogas, Biomass, Micro-grid, Waste to Energy, Small Hydro, Solar Energy, Wind Power |
Gujarat |
2010 |
| 146 |
Meghalaya State Electricity Regulatory Commission (Renewable Energy Purchase Obligation And Its Compliance) Regulations 2018 | Bagasse Cogen, Biogas, Biomass, Micro-grid, Waste to Energy, Small Hydro, Solar Energy,Wind Power |
Meghalaya |
2018 |
| 147 |
UPERC (Rooftop Solar PV Grid-Interactive Systems Gross/Net Metering) Regulations, 2019 (RSPV Regulations, 2019) | Solar Energy |
Uttar Pradesh |
2019 |
| 148 |
Uttarakhand Electricity Regulatory Commission (Tariff And Other Terms For Supply Of Electricity From Renewable Energy Sources And Non-fossil Fuel Based Co-generating Stations) Regulations 2018 | Wind Power, Solar Energy, Small Hydro, Waste to Energy, Micro-grid, Biomass, Biogas, Bagasse Cogen |
Uttarakhand |
2018 |
| 149 |
West Bengal Electricity Regulatory Commission (Open Access) Regulations, 2017 | Bagasse Cogen, Biogas, Biomass, Micro-grid, Waste to Energy, Small Hydro, Solar Energy, Wind Power |
West Bengal |
2017 |
| 150 |
Karnataka Renewable Power Purchase Obligation And Its Compliance Regulations, 2011 Including Amendments Thereafter | Wind Power,Solar Energy,Small Hydro |
Karnataka |
2018 |
| 151 |
Madhya Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement Mechanism And Related Matters Of Solar And Wind Generation Sources) Regulations, 2018 | Wind Power,Solar Energy |
Madhya Pradesh |
2018 |
| 152 |
Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement For Solar And Wind Generation Sources) Regulations, 2018 | Wind Power,Solar Energy |
Maharashtra |
2018 |
| 153 |
Punjab State Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement Mechanism And Related Matters Of Solar And Wind Generation Sources) Regulations, 2019 | |
Punjab |
2019 |
| 154 |
Rajasthan Renewable Energy Tariff Orders 2015 | Wind Power,Solar Energy,Small Hydro |
Rajasthan |
2015 |
| 155 |
Rajasthan Renewable Energy Power Purchase Obligation And Its Compliance Regulations, 2019 (Fifth Amendment) | Wind Power,Solar Energy |
Rajasthan |
2019 |
| 156 |
Tamil Nadu Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement And Related Matters Of Solar And Wind Generation Sources) Regulations, 2019 | Wind Power,Solar Energy,Small Hydro |
Tamil Nadu |
2019 |
| 157 |
Draft JERC Tariff Determination From Renewable Energy Sources Regulation, 2019 | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Micro-grid |
Goa |
2019 |
| 158 |
Draft JERC Solar PV Grid Interactive System Based On Net Metering Regulations, 2019 | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Micro-grid |
Goa |
2019 |
| 159 |
Assam Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement And Related Matters Of Solar And Wind Generation Sources) Regulations, 2018 | Wind Power,Solar Energy |
Assam |
2018 |
| 160 |
Chhattisgarh Electricity Regulatory Commission (Intra -state Availability Based Tariff And Deviation Settlement Mechanism) Regulations, 2016 | Wind Power,Solar Energy,Small Hydro |
Chhattisgarh |
2016 |
| 161 |
Gujarat Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement And Related Matters Of Solar And Wind Generation Sources) Regulations, 2017 | Solar Energy,Wind Power |
Gujarat |
2017 |
| 162 |
Haryana Electricity Regulatory Commision Terms And Condition For Determination Of Tariff For Renewable Energy Sources, Renewable Purchase Obligation And Renewable Energy Certificate Regulation 2017(1st Amendment) | Solar Energy |
Haryana |
2017 |
| 163 |
Haryana Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement For Solar And Wind Generation Sources) Regulations, 2019 | Solar Energy,Wind Power |
Haryana |
2019 |
| 164 |
Haryana Tariff Determination Of Renewable Energy Sources, Renewable Purchase Obligation And Renewable Energy Certificate Regulation, 2017, 2nd Amendment | Wind Power,Solar Energy,Small Hydro,Biogas |
Haryana |
2017 |
| 165 |
Jammu & Kashmir Grid Interactive Rooftop Solar Photovoltaic System Based On Net Metering Regulation 2015 | Solar Energy |
Jammu and Kashmir |
2015 |
| 166 |
Joint Electricity Regulatory Commission (Connectivity And Open Access In Intra-State Transmission And Distribution) Regulations 2017 | Wind Power,Solar Energy,Small Hydro |
Goa |
2017 |
| 167 |
Joint Electricity Regulatory Commission Of Manipur & Mizoram Forecasting, Scheduling, Deviation Settlement And Related Matters Of Solar And Wind Generation Sources Regulations, 2016 | Wind Power,Solar Energy |
Mizoram |
2016 |
| 168 |
Telangana Forecasting, Scheduling, Deviation Settlement And Related Matters Of Solar And Wind Generation Sources Regulations, 2018 | Wind Power,Solar Energy |
Telangana |
2018 |
| 169 |
Telangana Renewable Energy Purchase Obligation And Its Compliance Regulations 2018 | Wind Power,Solar Energy,Small Hydro |
Telangana |
2018 |
| 170 |
Uttarakhand Terms And Conditions Of Intra-state Open Access Regulations, 2015 Including Amendments Thereafter | Wind Power,Solar Energy,Small Hydro |
Uttarakhand |
2015 |
| 171 |
Uttar Pradesh Forecasting, Scheduling, Deviation Settlement And Related Matters Of Solar And Wind Generation Sources Regulations, 2018 | Wind Power,Solar Energy |
Uttar Pradesh |
2018 |
| 172 |
Uttar Pradesh Renewable Power Purchase Obligation And Its Compliance Regulations, 2011 Including Amendments Thereafter | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Micro-grid,Biomass,Biogas,Bagasse Cogen |
Uttar Pradesh |
2011 |
| 173 |
CERC Generic Tariff For RE Technologies For FY 2019-20 | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Micro-grid,Biomass,Biogas,Bagasse Cogen |
All India |
2019 |
| 174 |
JERC Generic Tariff For Solar PV, Wind And Small Hydro Power Plants For FY 2019-20 | Small Hydro,Solar Energy,Wind Power |
Goa |
2019 |
| 175 |
Karnataka Renewable Energy Tariff Orders (Consolidated) | Bagasse Cogen,Biomass,Solar Energy,Wind Power |
Karnataka |
2019 |
| 176 |
Rajasthan Net Metering Regulations – 2015 (Consolidated 1st Amendment) | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Micro-grid,Biomass,Biogas,Bagasse Cogen |
Rajasthan |
2015 |
| 177 |
Joint Electricity Regulatory Commission For Manipur And Mizoram (Terms And Conditions For Open Access) Regulations, 2010 | |
Mizoram |
2010 |
| 178 |
Joint Electricity Regulatory Commission For The States Of Manipur & Mizoram (Renewable Purchase Obligation And Its Compliance) Regulations, 2010 | |
Mizoram |
2010 |
| 179 |
Joint Electricity Regulatory Commission For Manipur And Mizoram (Metering For Grid Connected Renewable Energy) Regulations, 2016 | |
Mizoram |
2016 |
| 180 |
Joint Electricity Regulatory Commission For Manipur And Mizoram (Terms And Conditions For Tariff Determination from Renewable Energy Sources) Regulations, 2010 | |
Mizoram |
2010 |
| 181 |
Joint Electricity Regulatory Commission Of Manipur & Mizoram Forecasting, Scheduling, Deviation Settlement And Related Matters Of Solar And Wind Generation Sources Regulations, 2016 | Wind Power,Solar Energy |
Manipur |
2016 |
| 182 |
Assam Grid Interactive Solar PV System Regulations 2019 | Micro-grid,Solar Energy |
Assam |
2019 |
| 183 |
Chhattisgarh Grid Interactive Distributed Renewable Energy Sources Regulations 2019 | Micro-grid,Solar Energy |
Chhattisgarh |
2019 |
| 184 |
Maharashtra Renewable Power Purchase Obligation 2019 | Wind Power,Solar Energy,Small Hydro |
Maharashtra |
2019 |
| 185 |
Maharashtra Grid-Interactive Distributed Renewable Energy Sources Regulations 2019 | Micro-grid |
Maharashtra |
2019 |
| 186 |
Maharashtra Electricity Regulatory Commission (Terms And Conditions For Determination Of RE Tariff) Regulation — 2019 | Solar Energy |
Maharashtra |
2019 |
| 187 |
Madhya Pradesh Forecasting, Scheduling, Deviation Settlement Mechanism And Related Matters Of Solar And Wind Generation - 2018 (1st Amendment) | Wind Power,Solar Energy |
Madhya Pradesh |
2018 |
| 188 |
Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement And Related Matters Of Solar And Wind Generation) Regulations, - 2017 (1st Amendment 2020) | Wind Power,Solar Energy |
Rajasthan |
2017 |
| 189 |
Rajasthan Renewable Energy Power Purchase Obligation And Its Compliance Regulations - 2007 (6th Amendment 2020) | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Micro-grid,Biomass,Biogas,Bagasse Cogen |
Rajasthan |
2007 |
| 190 |
Rajasthan Renewable Energy Tariff - 2015 (Consolidated - 1st Amendment 2020) | Wind Power,Solar Energy,Small Hydro,Waste to Energy,Micro-grid,Biomass,Biogas,Bagasse Cogen |
Rajasthan |
2015 |
| 191 |
CERC Sharing Of Inter-State Transmission Charges And Losses Regulation — 2020 | Solar Energy,Wind Power |
All India |
2020 |
| 192 |
Central Electricity Regulation Commission (Terms And Conditions For Tariff Determination From RE Sources Regulations 2020) | Wind Power,Solar Energy |
All India |
2020 |
| 193 |
Andhra Pradesh Renewable Energy Export Policy 2020 | Solar Energy |
Andhra Pradesh |
2020 |
| 194 |
Delhi Electricity Regulatory Commission Group Net Metering And Virtual Net Metering For Renewable Energy 2019 | Solar Energy |
Delhi |
2019 |
| 195 |
Gujarat Net Metering Roof Top Solar PV Grid Interactive Systems) Regulations, 2016 With Amended Regulations, 2017 & 2020 | Solar Energy |
Gujarat |
2020 |
| 196 |
Haryana State Rooftop Solar Grid Interactive Systems Based On Net Metering Regulations 2019 | Solar Energy |
Haryana |
2019 |
| 197 |
Kerala Renewable Energy And Net Metering Regulation 2020 | Solar Energy |
Kerala |
2020 |
| 198 |
Test | Biogas |
All India |
2020 |
| 199 |
Chhattisgarh Renewable Energy Power Purchase Obligation And Its Compliance Regulations, 2016 (1st Amendment 2020) | Solar Energy |
Chhattisgarh |
2020 |
| 200 |
Draft Sikkim Grid-Interactive Distributed Solar Energy Systems Regulations 2020 | Solar Energy |
Sikkim |
2020 |
| 201 |
Punjab Net Metering Regulations, 2019 (1st Amendment 2020) | Solar Energy |
Punjab |
2020 |
| 202 |
Tamil Nadu Renewable Power Purchase Obligation Regulations 2010 (5th Amendment 2020) | Solar Energy |
Tamil Nadu |
2020 |
| 203 |
Telangana Net Metering Rooftop Solar PV Grid-Interactive Systems Regulations 2016 (1st Amendment 2021) | Solar Energy |
Telangana |
2020 |