Order on Net Metering/Bi-directional Metering and their
Connectivity with respect to Solar PV Projects, 2016 amended up to 17.01.2018
HIGHLIGHTS |
| Control Period | -- |
| Eligibility Condition | Consumer of distribution licensee. |
| Capacity Target for Distribution Licensee | Cumulative solar energy capacity should not exceed 75% of the distribution transformer’s capacity. |
| Metering Arrangement |
|
| Interconnection | Interconnection framework shall address parameters including connecting voltage level and minimum technical standards for interconnection following relevant regulations and orders. |
OTHER PROVISIONS |
| Energy Accounting and Settlement |
|
| Other Charges | -- |
| Penalty | -- |
| Link | |
| Reference |
About Portal
‘All About Renewables’ aims to bring about a change in the way we ‘look and search’ for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
(020) 26613855
(020) 26613832