Punjab Renewable Energy Tariff Orders - 2016

HIGHLIGHTS

 

Tariff Period

  • As per CERC RE Regulations, 2012, First Amendment 2014 and CERC Order dated 31.03.2015.
  • 20 years for MSW and RDF projects.

Control Period

FY 2015-16

Useful Life of a Plant

  • As per CERC RE Regulations, 2012; First Amendment 2014 and CERC Order dated 31.03.2015.
  • 20 years for MSW and RDF projects.

Technology-wise Net Tariff

Technology

Net Tariff (in Rs./kWh)

Wind

5.87

Small hydro below 5 MW

5.47

Small hydro (5 MW to 25 MW)

4.65

Solar PV

6.35

Solar thermal

10.80

Biomass (other than rice straw) with water cooled condenser

7.58

Biomass gasifier

7.39

Biogas

7.60

Non-fossil fuel based cogeneration

6.66

MSW to power

6.50

RDF based projects

7.59

 

Normative Parameters

  • As per CERC RE Regulations, 2012; First Amendment 2014 and CERC Order dated 31.03.2015.
  • Capital cost for biomass projects with water cooled condenser –Rs.558.705 Lakhs/MW.

 

OTHER PROVISIONS

 

Tariff structure and design

Single part, levellised tariff.

Merit Order Despatch Principle

Not available

Subsidy or/and Incentives by government

Impact of capital subsidy, central financial assistance and generation based incentives on levellised tariff would be computed on case to case basis.

Rebate

Not available

Late payment surcharge

Not available

Link

http://www.pserc.nic.in/pages/Petitions2015.html 

Reference

http://www.pserc.nic.in/pages/Generic%20Tariff%20Order%202015-16.pdf
 

http://www.pserc.nic.in/pages/suo-motu-petition-3of2016.pdf

About Portal

‘All About Renewables’ aims to bring about a change in the way we ‘look and search’ for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More

Contact

Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India

(020) 26613855
(020) 26613832