Haryana State Rooftop Solar Grid Interactive Systems Based on Net Metering Regulations 2019

HIGHLIGHTS

 

Control Period

FY 2020-21

Eligibility

  • Eligible consumers of distribution licensees.
  • Capacity of solar plant should not exceed contract demand, with capacity of solar plant being minimum 1 kW to maximum of 2 MW.
  • Project with capacity above 1 MW must install battery storage ( 25% of incremental plant capacity over 1 MW).

Renewable Purchase Obligation

  • Quantum of electricity generated by non-obligated consumer will account towards licensee RPO target.
  • Total electricity generated by agriculture pump will account for licensee RPO target.

Metering Arrangement

  • Net meter and Check meter will be purchased by consumer.
  • Mandatory AMR meter for solar plant system having capacity above 20 kW.

Timeline for Rooftop project

After submission of rooftop solar installation application

  • Technical feasibility by licensee within 15 days from Date of Acknowledgment (DoA) of application.
  • Letter of approval (LOA)/ Cancellation of application within 22 days from DoA.
  • Installation of solar plant within 180 days from LOA.
  • Net meter procument within 30 days from LOA.
  • Site inspection and grid synchronization by authority within 7 days from submission of work completion report.

 

OTHER PROVISIONS

 

Energy Accounting and Settlement

  • Cumulative energy generation cannot be more than 90% of total energy consumption in a financial year. Excess energy generation will not be compensated or carried forwarded to next financial year.
  • Net export of energy by consumer shall be treated as electricity credit and carried forward to the next billing period.
  • In case of net import of energy, distribution licensee shall recover energy charges for such power imported after adjusting for electricity credits from the preceding billing period.
  • No carry forward of electricity credit shall be allowed beyond the settlement period.
  • In case of time of day tariff, net flows during any time block shall not be adjusted against any other time block of the day.
  • Net export of energy by agriculture pump sets under net metering will be paid at Re 1/unit.

Other Charges

Exempted from wheeling, banking, T&D  and cross subsidy surcharge

Subsidy distribution agency

HAREDA or Distribution licensee

Old connection

Consumer under Net metering regulation2014 will not be affected.

Link

https://herc.gov.in/Regulation/1.aspx

Reference

https://herc.gov.in/WriteReadData/Pdf/R20191025.pdf

 

About Portal

‘All About Renewables’ aims to bring about a change in the way we ‘look and search’ for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More

Contact

Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India

(020) 26613855
(020) 26613832