Download Home Back

Chhattisgarh Wind Policy - 2006

HIGHLIGHTS

 

Nodal Agency

Chhattisgarh Renewable Energy Development Agency (CREDA)

Applicable Technologies

Wind power

Policy Period

Not available

Targets under Policy

Not available

Incentive Amount

As declared in the State ‘industrial policy’

Eligibility Conditions

As per project tender specifications

Sale of electricity

State govt. shall have the first right to purchase the electrical energy generated.

Grid Interfacing &Maintenance

By the developer at his expense and as per CSEB specifications.

Evacuation Arrangement

CSEB /DISCOM

 

OTHER PROVISIONS

 

CREDA shall carry out wind monitoring for identification of siteswith potential. Private consulting firms are also encouraged to conduct wind monitoring.

 

Wind monitoring

CREDA or any renowned energy consulting firm, enlisted with MNRE, may be permitted to conduct wind monitoring. No two prospectors shall be allowed to conduct studies within 50 Km of each other. The allotted firm shall carry out the monitoring for at least 24 consecutive months and shall have its data verified by the institution recommended by MNRE. 

Selection of site

  •  The developer will be selected on the basis of an open tender for the installation of wind energy generators at the "eligible site" identified by CREDA. Such developer will be given the land use right for installation of generator within a 25 Km radius of the "eligible site".
  •  If any private developer identifies an "eligible site", then first right for installation of the generator will be given to that developer for the land within a 10 Km radius of the "eligible site". 

Evacuation arrangement

CSEB will undertake to transmit, on its grid, the power generated by the eligible developer and make it available to him for captive use or to the third party nominated by him (developer), at the charges determined by CSERC, irrespective of the distance from the generating station. 

Land allotment

  •  Govt Land - The land use permission for government land will be given to the developer for 30 years or the period of the project, whichever isless .Such land shall be allotted in accordance with the requirement conveyed by the Energy Department to the Revenue Department.
  • Private Land - Acquisition of land will be carried out as per the ideal rehabilitation policy under Land Acquisition Act of the State Government.

    OR 
  • If the landowner opts to give the developer use of his land for the projectthen the developer shall pay an annual rent of Rs.5000/- per acre to the landowner. This rent will increase @15% every three years. This arrangement will be in force for 30 years.

Links

http://www.creda.in/ 

References

http://www.creda.in/power-generation-wind-policy

About Portal

‘All About Renewables’ aims to bring about a change in the way we ‘look and search’ for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More

Contact

Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India

(020) 26613855
(020) 26613832