Jharkhand Renewable Energy Tariff Regulations - 2016
HIGHLIGHTS |
Tariff Period | Technology | No. of Years |
Wind, solar PV, solar thermal | 25 | |
Small hydro | 35 | |
Biomass gasifier, biogas, municipal solid waste (MSW), refuse derived fuel (RDF) | 20 | |
Biomass Rankine cycle, non-fossil fuel based cogeneration | 13 | |
| ||
Control Period | Technology | Year |
Wind, biogas, MSW, RDF, biomass, non-fossil fuel based cogeneration | April 1, 2016 to March 31, 2020. | |
Small hydro | Date of gazette notification to March 31, 2020. | |
Solar PV, solar thermal | January 20, 2016 to March 31, 2020. | |
Useful Life of a Plant | Technology | Years |
Wind, solar PV, solar thermal | 25 | |
Biogas, MSW, RDF, biomass, non-fossil fuel based cogeneration | 20 | |
Small hydro | 35 | |
Technology-wise Net Tariff | Not available | |
Capital Cost | Technology | Capital Cost (in Rs. lakh/MW) |
Wind | 620.00 | |
Biogas | 1190.00 | |
MSW | 1500.00 | |
RDF | 900.00 | |
Small hydro (below 5 MW) | 650.00 | |
Small hydro (5 MW to 25 MW) | 595.00 | |
Solar PV | 605.85 | |
Solar thermal | 1200.00 | |
Biomass Rankine cycle using other than rice straw and juliflora with water cooled condenser. | 560.00 | |
Biomass Rankine cycle using other than rice straw and juliflora with air cooled condenser. | 600.00 | |
Biomass Rankine cycle using rice straw and juliflora with water cooled condenser. | 611.00 | |
Biomass Rankine cycle using rice straw and juliflora with air cooled condenser. | 653.00 | |
Biomass gasifier | 593.00 | |
Non-fossil fuel based cogeneration | 453.00 | |
| ||
Operation and Maintenance (O&M)Expenses | Technology | O&M (in Rs. lakh/MW) |
Wind | 12.00 | |
Biogas | 50.00 | |
MSW | 95.00 | |
RDF | 54.00 | |
Small hydro (below 5 MW) | 24.98 | |
Small hydro (5 MW to 25 MW) | 17.48 | |
Solar PV | 11.88 | |
Solar thermal | 17.16 | |
Biomass Rankine cycle | 47.00 | |
Biomass gasifier | 50.00 | |
Non-fossil fuel based cogeneration | 20.00 | |
| ||
Interest Rate on Loan | Average State Bank of India base rate prevalent during the first six months of the previous year plus 300 basis points. | |
Depreciation | 5.83% for first 12 years and remaining depreciation spread over the residual useful life of the project. | |
Return on Equity |
| |
Interest on Working Capital | Average State Bank of India base rate prevalent during the first six months of the previous year plus 350 basis points. |
OTHER PROVISIONS |
Tariff structure and design | Generic, single part, levellised tariff. |
Merit order despatch principle |
|
Subsidy or/and incentives by government |
|
Rebate |
|
Late payment surcharge | 1.25% per month for delay beyond 60 days of billing. |
Links | |
References | http://jserc.org/pdf/draft_regulations/draft_biogas.pdf http://jserc.org/pdf/draft_regulations/draft_smallhydropower.pdf |
About Portal
‘All About Renewables’ aims to bring about a change in the way we ‘look and search’ for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
(020) 26613855
(020) 26613832