Jharkhand Renewable Energy Tariff Regulations - 2016

HIGHLIGHTS

 

Tariff Period

Technology

No. of Years

Wind, solar PV, solar thermal

25

Small hydro

35

Biomass gasifier, biogas, municipal solid waste (MSW), refuse derived fuel (RDF)

20

Biomass Rankine cycle, non-fossil fuel based cogeneration

13

 

Control Period

Technology

Year

Wind, biogas, MSW, RDF, biomass, non-fossil fuel based cogeneration April 1, 2016 to March 31, 2020.
Small hydro Date of gazette notification to March 31, 2020.
Solar PV, solar thermal January 20, 2016 to March 31, 2020.
 
Useful Life of a Plant

Technology

Years

Wind, solar PV, solar thermal

25

Biogas, MSW, RDF, biomass, non-fossil fuel based cogeneration

20

Small hydro

35

 
Technology-wise Net Tariff Not available
Capital Cost

Technology

Capital Cost (in Rs. lakh/MW)

Wind

620.00

Biogas

1190.00

MSW

1500.00

RDF

900.00

Small hydro (below 5 MW)

650.00

Small hydro (5 MW to 25 MW)

595.00

Solar PV

605.85

Solar thermal

1200.00

Biomass Rankine cycle using other than rice straw and juliflora with water cooled condenser.

560.00

Biomass Rankine cycle using other than rice straw and juliflora with air cooled condenser.

600.00

Biomass Rankine cycle using rice straw and juliflora with water cooled condenser.

611.00

Biomass Rankine cycle using rice straw and juliflora with air cooled condenser.

653.00

Biomass gasifier

593.00

Non-fossil fuel based cogeneration

453.00

  • All capital costs except for solar PV and thermal projects are for FY 2016-17.For solar PV and thermal projects the period is FY 2015-16.
  • Capital costs for subsequent years for MSW, RDF, solar PV and solar thermal will be revised every year while those of other technologies shall be linked to the indexation formula as per regulations.
Operation and Maintenance (O&M)Expenses

Technology

O&M (in Rs. lakh/MW)

Wind

12.00

Biogas

50.00

MSW

95.00

RDF

54.00

Small hydro (below 5 MW)

24.98

Small hydro (5 MW to 25 MW)

17.48

Solar PV

11.88

Solar thermal

17.16

Biomass Rankine cycle

47.00

Biomass gasifier

50.00

Non-fossil fuel based cogeneration

20.00

  • O&M cost is escalated at 5.72% per annum.
Interest Rate on Loan

Average State Bank of India base rate prevalent during the first six months of the previous year plus 300 basis points.

Depreciation

5.83% for first 12 years and remaining depreciation spread over the residual useful life of the project.

Return on Equity
  • 20% per annum for first 10 years.
  • 24% per annum for 11th year onwards.
Interest on Working Capital

Average State Bank of India base rate prevalent during the first six months of the previous year plus 350 basis points.

 

OTHER PROVISIONS

 

Tariff structure and design

Generic, single part, levellised tariff.

Merit order despatch principle
  • All renewable power plants of capacity 10 MW and above except wind, biomass and cogeneration are ‘Mustrun’ power plants.
  • Wind power plants with sum of generation capacity of 10 MW and above and connected at 33 KV and above shall be subject to scheduling.
  • Solar plants of capacity 5MW and above connected at 33 KV level  shall be subject to scheduling and dispatch code.
  • Biomass plants with capacity of 10 MW and above and non-fossil fuel based cogeneration plants shall be subject to scheduling and dispatch code.
Subsidy or/and incentives by government
  • Subsidy or incentives, including accelerated depreciation benefit, shall be considered for tariff determination.
  • Projects are eligible for incentives announced in Jharkhand Industrial Policy, 2012.
  • 50% exemption from electricity duty for a period of 10 years and 5 years for renewable based power plants and captive power plants (set up by new and existing industrial units) respectively.
  • Solar projects are eligible for incentives under State Solar Policy, 2015.
Rebate
  • 2% rebate – for payment through Letter of Credit within one month of presentation of bills.
  • 1% rebate – for payment not through Letter of Credit within one month of presentation of bills.
Late payment surcharge 1.25% per month for delay beyond 60 days of billing.
Links

http://jserc.org/regulation.aspx

References http://jserc.org/pdf/draft_regulations/draft_biogas.pdf

http://jserc.org/pdf/draft_regulations/draft_smallhydropower.pdf

http://jserc.org/pdf/regulations/48_2_2016.pdf

http://jserc.org/pdf/draft_regulations/draft_biomass.pdf

 

 

About Portal

‘All About Renewables’ aims to bring about a change in the way we ‘look and search’ for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More

Contact

Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India

(020) 26613855
(020) 26613832