Himachal Pradesh Renewable Energy Tariff Regulations - 2012
HIGHLIGHTS |
Tariff Period | Technology | No. of Years |
Small hydro power | 40 | |
Solar PV | 25 | |
MSW and RDF | 20 | |
Tariff period for other technologies shall be as determined by the Commission. | ||
Control Period | December 18, 2012 to March 31, 2017 | |
Useful Life of a Plant | Technology | No. of Years |
Small hydro | 40 | |
Wind, solar PV and thermal | 25 | |
Biomass, non-fossil fuel based cogeneration | 20 | |
For any other MNRE approved technology this may be fixed by the Commission. | ||
Technology-wise Net Tariff | Technology | Net Tariff (Rs./kWh) |
SHP Category – I (100 kW to 2 MW) | 3.04 | |
SHP Category – II (2 MW to 5 MW) | 2.98 | |
SHP Category – III (5 MW to 25 MW) | 2.89 | |
Solar PV (up to 1 MW) | 5.31 | |
Solar PV (above 1 MW to 5 MW) | 2.25 | |
MSW (gross tariff) | 7.04 | |
RDF based MSW (gross tariff) | 7.90 | |
Capital Cost | Technology | Capital Cost (Rs. lakh/MW) |
Small hydro (above 100 kW to 2 MW) | 780.00 | |
Small hydro (above 2 MW to 5 MW) | 750.00 | |
Small hydro (Aaove 5 MW to 25 MW) | 700.00 | |
Solar PV up to 1 MW | 569.77 | |
Solar PV above 1 MW to 5 MW | 561.82 | |
MSW | 1500.00 | |
RDF | 900.00 | |
Operation and Maintenance (O&M) Expenses | Technology | O&M Cost (Rs. lakh/MW) |
Small hydro (above 100 kW to 2 MW) | 25.00 | |
Small hydro (above 2 MW to 5 MW) | 22.00 | |
Small hydro (above 5 MW to 25 MW) | 18.00 | |
Solar PV up to 1 MW | 7.00 | |
Solar PV above 1 MW to 5 MW | 7.00 | |
MSW | 90.00 | |
RDF | 54.00 | |
| ||
Interest on Loan | Average State Bank of India base rate prevalent during 6 months preceding the date of commencement of these regulations plus 300 basis points. | |
Depreciation |
| |
Return on Equity |
| |
Interest on Working Capital | In case of tariff determination on financial year basis, interest rate would be average base rate of the State Bank of India prevalent during the first six months of the previous year plus 350 basis points. |
OTHER PROVISIONS |
Tariff structure and design | Single part, levellised tariff for the tariff period. |
Merit order despatch | Not Available |
Subsidy or/and Incentives by government | Any incentive and/or subsidy and/or grant provided by the central or state government including accelerated depreciation benefit would be taken into consideration for determination of tariff. |
Rebate |
|
Late payment surcharge | 1.25% per month for payment of bills beyond a period of 60 days from the date of billing. |
Links | |
References | http://hperc.org/File1/re12final.pdf |
About Portal
‘All About Renewables’ aims to bring about a change in the way we ‘look and search’ for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
(020) 26613855
(020) 26613832