Chhattisgarh Open Access Regulations (Consolidated) - 2011
HIGHLIGHTS |
Eligibility to seek Open Access (OA) | Intra-state users or an applicant seeking open access for 1 MW and above, on payment of such charges as may be determined by the Commission from time to time. | ||||||||||
Electricity Tariff FY 2016-17 (Rs./kVAh) | Energy charge(Rs/kVAh) | ||||||||||
HV 1 – Railway traction | 5.00 | ||||||||||
HV 2 – Mines | 6.70 (for 11kV);6.40 (for 33kV);6.15(for 132kV); 6.00 for 220 kV). | ||||||||||
HV3 – Other industrial and general purpose non-industrial | 6.90 (for 11kV; load factor 6.70 (for11 kV, Load Factor >15%) 6.50 (for 33kV; load factor 6.35 (for33kV, Load Factor >15%) 6.00 (for 132 kV) 5.90 (for 220 kV) | ||||||||||
HV4 – Steel industry | 6.90 (for 11kV; load factor 6.10 (for11 kV, Load Factor >15%) 6.50 (for 33kV; load factor 6.00 (for33kV, Load Factor >15%) 5.75 (for 132 kV) 5.60 (for 220 kV) | ||||||||||
HV5 – Low factor industries | 5.50 | ||||||||||
HV 10 – IT industries | 4.5 | ||||||||||
Connectivity Charges and Procedure |
| ||||||||||
Licensee System where connectivity is required | Nodal Agency | Applicant | Max. quantum of power transacted | Application fee (Rs. lakhs) | Time Frame | ||||||
STU | STU | Generating company or captive generating plant. | 1 MW – 50MW | 2 | 30 days – informing feasibility.
Issue of demand note of estimated charges and notice of feasibility – Further 60 days (Max 90 days total from receipt of application) | ||||||
50 MW- 250 MW | 4 | ||||||||||
250MW – 1000 MW | 6 | ||||||||||
1000 MW+ | 9 | ||||||||||
Bulk consumer, captive user | 1 MW – 50 MW | 2 | |||||||||
50MW+ | 4 | ||||||||||
Transmission Licensee other than STU. | Transmission Licensee | Generating company or captive generating plant. | 1 MW- 50 MW | 2 | |||||||
50 MW- 250 MW | 4 | ||||||||||
250 MW + | 6 | ||||||||||
Bulk consumer, captive user | 1 MW- 50MW | 2 | |||||||||
50 MW + | 4 | ||||||||||
Distribution Licensee | Distribution Licensee | Generating company or captive generating plant | 15 MW and below | 2 | As per the provision in SupplyCode for HT connection. | ||||||
Bulk consumer, captive user | 1 MW- 9 MW | 2 | |||||||||
Nodal Agency | -As per the table below - | ||||||||||
Procedure and Charges for Long-Term Open Access (LTOA) |
| ||||||||||
Location of Drawal and Injection point | Nodal Agency | Application Fee (Rs. lakhs) | |||||||||
Both in STU area | STU | 2 | |||||||||
Both in intra-state transmission licensee area(with no STU involvement). | Transmission Licensee | 2 | |||||||||
Located in STU network and intra-state transmission licensee (other than STU) network or vice versa. | STU | 4 | |||||||||
At intra-state transmission system and distribution licensee’s system and vice versa. | STU | 4 | |||||||||
Both within the same distribution licensee area No involvement of state transmission network. | Concerned distribution licensee | 2 | |||||||||
Both within the same distribution licensee area but with involvement of state transmission network in conveyance of electricity. | STU | 4 | |||||||||
Both within the same state but with different distribution licensees. | STU | 4 | |||||||||
Relinquishment of OA rights: No charges for notice of minimum 1 year; If notice is less than 1 year, customer shall pay an amount equal to 66% of the estimated transmission charges (net present value) and/or wheeling charges (net present value). | |||||||||||
Procedure and Charges for Medium-Term Open Access (MTOA) |
| ||||||||||
Location of Drawal and Injection point | Nodal Agency | Application Fee (Rs. Lakhs) | Time Frame | ||||||||
Both in STU. | STU | 1 | 30 days | ||||||||
Both in Intra-state transmission licensee area (with no STU involvement). | Transmission Licensee | 1 | |||||||||
Located in STU network and intra-state transmission licensee (other than STU) network or vice versa. | STU | 2 | 40 days | ||||||||
At intra-state transmission system and distribution licensee’s system and vice versa. | STU | 2 | 30 days | ||||||||
Both within the same distribution licensee area. No involvement of state transmission network. | Concerned distribution licensee | 1 | 30 days | ||||||||
Both within the same distribution licensee area but with involvement of state transmission network in conveyance of electricity. | STU | 2 | 30 days | ||||||||
Both within the same state but with different distribution licensees area. | STU | 2 | 30 days | ||||||||
| |||||||||||
Procedure and Charges for Short Term Open Access |
| ||||||||||
Location of Drawal and Injection point | Nodal Agency | Application Fee (Rs.) | Time Frame | ||||||||
Both in STU. | SLDC | 2500 | 10 working days in case STOA applied for the first time.
7 working days on subsequent STOA applications.
2 working days for informing deficiency or defect in application. | ||||||||
Both in intra-state transmission licensee area (with no STU involvement). | Transmission licensee | 2500 | |||||||||
Located in STU network and intra-state trans- mission licensee (other than STU) network or vice versa. | SLDC | 5000 | |||||||||
At intra-state transmission system and distribution licensee’s system and vice versa. | SLDC | 5000 | |||||||||
Both within the same distribution licensee area and no involvement of state transmission network | Concern distribution Licensee | 2500 | |||||||||
Both within the same distribution licensee area with involvement of state transmission network in conveyance of electricity. | SLDC | 5000 | |||||||||
Both within the same state but different distribution licensees. | SLDC | 5000 | |||||||||
Day-ahead Transactions: Day-ahead transactions shall be permitted in case there is availability of surplus capacity in the licensee’s system, which has been expressly surrendered whole or part thereof or not in use for more than three days in the past. Nodal agency shall check for congestion and convey grant of approval or otherwise. All other provisions of application for short-term open access shall apply. |
OTHER PROVISIONS |
Allotment priority |
| ||
Open access charges |
Transmission and Wheeling Charges
Cross Subsidy Surcharge
Additional Surcharge
| ||
Scheduling and Metering | Scheduling
Metering
| ||
Energy losses |
Transmission and Wheeling Losses
| ||
Imbalance and Reactive energy charges | Imbalance energy charges
| ||
Absolute error in time block (15 min) | Deviation Charges Payable to State DSM Pool | ||
<15% | At fixed rate for shortfall of energy (APPC rate at state level). | ||
15 - 25% | At fixed rate till 15% + 110% of fixed rate beyond 15% upto 25%. | ||
25 – 35% | As above, upto 25% +120% of fixed rate beyond 25% upto 35%. | ||
> 35% | As above, upto 35% +130% of fixed rate on balance energy beyond 35%. | ||
In the event of the actual generation of renewable generator being more than the scheduled generation, the deviation charges for excess generation shall be payable to the RE generators from the state DSM pool. | |||
Absolute error in time block (15 min) | Deviation Charges Payable to RE Generators | ||
<15% | At fixed rate for excess of energy (APPC rate at state level). | ||
15 - 25% | At fixed rate till 15% + 90% of fixed rate beyond 15% upto 25%. | ||
25 – 35% | As above, up to 25% +80% of fixed rate beyond 25% up to 35%. | ||
> 35% | As above, up to 35% +70% of fixed rate on balance energy beyond 35%. | ||
Reactive energy charges
Reactive energy charges shall be levied at the rate of 27 paisa/kVArh (Tariff Order FY 17-18). | |||
Link | http://www.cserc.gov.in/regulation_final.htm | ||
References | Open access Regulations 2011:
Amendment 1: 2012:
Settlement and balancing Regulations 2016:
http://www.cserc.gov.in/pdf/74-CSERC%20(Intra-state%20Availability%20Based%20Tariff%20and%20Deviation%20Settlement%20Mechanism)
Tariff Order 2017-18: |
About Portal
‘All About Renewables’ aims to bring about a change in the way we ‘look and search’ for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
(020) 26613855
(020) 26613832