Bihar Tariff Order* for Biomass, Bagasse Cogeneration, Biomass Gasifier and MSW based Power Plants - 2016

HIGHLIGHTS

 

Tariff Period

Technology

No. of Years

Biomass

13

Bagasse cogeneration

13

Biomass gasifier

20

MSW/RDF

20

 

Control Period

5

Useful Life of a Plant

20

Technology-wise Net Tariff

Technology

Net Tariff (Rs./kWh)

Biomass with watercooled condenser using rice straw, husk and juliflora.

7.38

Biomass with water cooled condenser using other than rice straw, husk and juliflora.

7.24

Biomass with air cooled condenser using rice straw, husk and juliflora.

7.63

Biomass with air cooled condenser using other than rice straw and juliflora.

7.58

Bagasse cogeneration

5.77

Biomass gasifier

6.68

MSW

6.61

RDF

7.83

 

Capital Cost Technology

Capital Cost

(Rs.lakh/MW)

Biomass with water cooled condenser using rice straw, husk and juliflora.

609.234

Biomass with water cooled condenser using other than rice straw, husk and juliflora.

557.611

Biomass with air cooled condenser using rice straw, husk and juliflora.

650.538

Biomass with air cooled condenser using other than rice straw and juliflora.

598.908

Bagasse cogeneration

451.504

Biomass gasifier

441.250

MSW

1500.00

RDF

900.00

  • All capital costs are for FY 2016-17
Operation and Maintenance (O&M) Expenses

Technology

O&M Cost

(Rs.lakh/MW)

Biomass

47.26

Bagasse cogeneration

19.99

Biomass gasifier

49.97

MSW

95.15

RDF

57.09

  • O&M costs are for FY 2016-17 and escalated at the rate of 5.72% per annum.
Interest Rate on Loans

12.76%

Depreciation
  • 7% per annum for first 10 years.
  • 2% per annum for next 10 years.
Return on Equity
  • Pre-tax – 20% per annum – first 10 years.
  • Pre-tax – 24% per annum – 11th year onwards.
Interest on Working Capital 13.26%

 

OTHER PROVISIONS

 

Tariff Structure and Design

Generic, levellised tariff.

Merit Order Despatch principle Not available
Subsidy or/and Incentives by the government
  • Projects will benefit from the incentives by central and state government policies.
  • Exemption from electricity duty.
  • Exemption from entry tax.
  • Loans will be available as per guidelines/incentives of governments, IREDA and MNRE.
Rebate
  • 2% if payment made to the developer is through Letter of Credit.
  • 1% if payment made other than through Letter of Credit within a period of one month of presentation of bills.
Late payment surcharge

1.25% per month for payment of bills beyond a period of 60 days from the date of billing.

Links

http://berc.co.in/pages/otherorders.S3InfoSystem

References

http://berc.co.in/media/Other-Order/order-SMP-19%20of%202016.pdf

http://berc.co.in/media/Other-Order/bagasse%20full%20order%2030-11-2012.pdf

*Bihar has published different order for these technologies rather than tariff regulations.

 

 

About Portal

‘All About Renewables’ aims to bring about a change in the way we ‘look and search’ for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More

Contact

Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India

(020) 26613855
(020) 26613832