Download Home Back

Arunachal Pradesh Renewable Energy Tariff Regulations - 2012

HIGHLIGHTS

 

Tariff Period

Technology

Years

Wind, small hydro (5 MW to 25 MW), biomass based on Rankine cycle, solar thermal 13
Biomass gasifier 20
Solar PV 25
Small hydro below 5 MW 35
 
Control Period

·         5 years, of which the first year shall be FY 2012-13.

·         Amended regulation 2017 shall be effective between 1st April, 2017 and 31st March, 2018

Useful Life of a Plant

Technology

Years

Non-fossil fuel based co-generation, biomass based on Rankine cycle, biomass gasifier, biogas 20
Solar PV, solar thermal 25
Small hydro 35
   
Technology-wise Net Tariff (Rs./kWh) Not available
Capital Cost

All capital costs are for FY 2012-13, and the same for subsequent years is determined using indexation formula in the regulations.

Technology

Capital Cost

(in Rs. Lakh/MW)

Small hydro below 5 MW

700

Small hydro (5 MW to 25 MW)

630

Biomass based on Rankine cycle ( water-cooled condenser)

445

Solar PV

1000

Biomass gasifier

550

 
Operation and Maintenance
 (O&M) Expenses
All O&M costs are for FY 2012-13, and the same for subsequent years shall be escalated at the rate of 5.72% per annum.

Technology

O&M Cost

(in Rs. lakh/MW)

Small hydro below 5 MW

25

Small hydro (5 MW to 25 MW)

18

Biomass based on Rankine cycle technology

24

Solar PV

11

Biomass gasifier

35

 
Interest Rate on Loans

Average State Bank of India base rate prevalent during first six months of the previous year plus 300 basis points.

Depreciation 5.83% for first 12 years and remaining depreciation spread over residual useful life of the project. 
Return on Equity 20% per annum for first 10 years.

24% per annum from 11th year onwards.

Interest on Working Capital

Average State Bank of India base rate prevalent during first six months of the previous year plus 350 basis points.

 

OTHER PROVISIONS

 

Tariff structure and design
  • Generic, single part, levellised tariff for the tariff period.
  • Project specific tariff shall be determined by the commission on case to case basis for Municipal Solid Waste projects and any other new technologies approved by MNRE
  • Project specific tariff for small hydro projects of capacity 1 MW and above, unless tariff is determined through a process of open tariff based bidding.
  • Project specific tariff shall be determined on annual basis.
Merit Order Despatch Principle

Power plants, except biomass, with installed capacity of 10 MW and above are ‘must run’ plants and not subject to ‘merit order dispatch’ principles.

Subsidy or/and Incentives by state/central government

Any incentive or subsidy provided by the central or state government including accelerated depreciation benefit would be taken into consideration for determination of tariff.

Rebate
  • 2% - for payment through letter of credit.
  • 1% - for payments not through letter of credit but within 1 month from the date of presentation of bills.
Late payment surcharge

1.25% per month for payment of bills beyond a period of 60 days from the date of billing.

Links

http://www.apserc.in/regulation.html

References

http://www.apserc.in/pdf/Regulations/7-Final-Renewable-Energy-Tarrif-9-4-2012-7th-Notification.pdf

http://www.apserc.in/pdf/Regulations/23-RE-TARIFF.pdf

 

 

About Portal

‘All About Renewables’ aims to bring about a change in the way we ‘look and search’ for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More

Contact

Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India

(020) 26613855
(020) 26613832